Class 1: part of room, little absorbed Class 2: full room, carpet/cushion/subfloor Class 3: walls, ceilings, insulation saturated Class 4: deeply saturated — desiccant required
Required PPE
Was suppression or hydrant water introduced?
Water mitigation scope required alongside fire restoration. Water category and IICRC drying equipment will be added.
Enter total sq ft and flooring sq ft above, then click Yes again.
Fill in sq ft and flooring sq ft in the Scope section above, select water category and class if applicable, then click Calculate equipment.
Equipment on estimateQty, days and rate are all editable
Item
Qty
Days
Rate/day
Total
No equipment added yet
Add item:
Custom:
Auto crew calculated
$0
Role
Basis
People
Hrs/day
Days
Rate
Total
Enter sq ft + damage level above, then press Populate crew
Travel time & per diem
$0
Auto-fills from total crew count
Auto-fills from total crew count
Per diem: GSA rate $44/day. Travel billed each mobilization day at applicable labor rate.
Labor rate modifier
Enter days worked at premium rates — leave blank for standard only
Rate tier
Multiplier
Days at this rate
When it applies
After Hours
1.5×
4:30 PM–8:00 AM (first 72 hrs of project) — 1.5× standard
Weekend (Sat & Sun)
1.5×
All work performed Saturday & Sunday — 1.5× standard
Holiday
2.0×
Federal holidays — New Year's, Memorial, Independence, Labor, Thanksgiving, Christmas
Standard (Mon–Fri 8am–4:30pm) and After Hours (4:30pm–8am, first 72 hrs) are billed automatically at 1.0× and 1.5× respectively.
Additional specialty labor
$0
Role
People
Hrs/day
Days
Rate
Total
Add specialty roles here (e.g. CFORE, CDL, HSO, BHT)
Supplies & Consumables
$0
Item
Qty
Unit rate
Total
No supplies added yet
Subcontractors manual entry
$0
Enter vendor name, scope, estimated cost, and markup %. Billable = cost x (1 + markup %).
Vendor
Scope
Type
Est. cost
Markup
Billable
No subcontractors added yet
Crew labor subtotal
$0
Additional labor subtotal
$0
Equipment subtotal
$0
Supplies subtotal
$0
Subcontractors subtotal
$0
Mobilization fee (6%)
$0
Travel & per diem
$0
Small tools (2% of labor)
$0
Estimated tax (0%)
$0
Contingency (0%)
$0
ROM Total
$0
Add any equipment not in the IICRC calculator - generators, dumpsters, lifts, pumps, rentals, or custom items. Everything added here rolls into the Equipment subtotal on the Estimate tab.
Add custom equipment item
Quick add - common items
Manual equipment list
$0
Item
Category
Notes
Qty
Days
Rate/day
Total
No manual equipment added yet
Items appear in Equipment subtotal on the Estimate tab and are included in Analysis calculations. Days left blank use the job duration.
Build your estimate first, then return here for analysis.
Fill in customer and property details. The proposal pulls all scope, equipment, timeline, and pricing from your estimate automatically.
Critical Path & Project Milestones
Auto-generated from your estimate — phases, go/no-go gates, and daily accountability milestones
📅
Build your estimate first
Complete the Estimate tab (loss type, sqft, crew, equipment) then click Generate critical path